87,000-sf Material Recycling Facility

Solid Waste

Fort Worth, TX

This project included the renovation and expansion of an existing abandoned transfer station, converting the facility into a transfer station and materials recovery facility. The resulting facility received LEED certification for sustainable construction practices. Anchor Construction worked within a twelve-month schedule to design, permit, construct, and commission this facility. 

The expanded facility includes significant two-story office spaces, equipment pads and foundation, equipment pits and walls, an environmental separation wall, a truck loading dock, an under-slab drainage system, an electrical system serving the equipment, and a bale storage area. The project was constructed over extremely expansive soils adjacent to historical dump sites, which required constant monitoring for waste during construction.

Material Recycling Facility
Material Recycling Facility
Material Recycling Facility
Material Recycling Facility
Material Recycling Facility
Material Recycling Facility
Material Recycling Facility
Material Recycling Facility
Material Recycling Facility
Material Recycling Facility
Material Recycling Facility
Material Recycling Facility
Material Recycling Facility
Material Recycling Facility
Material Recycling Facility