Anchor designed and provided construction oversight for the replacement of a transfer facility tipping floor. The floor, initially installed in 2007, failed. Anchor was selected to prepare construction plans and other bidding documents for this open bid municipal project. The floor replacement included design details for slab on grade, push walls to remain, push walls to be replaced, and slab on steel decking over tunnel sections. The design plans included various bid alternatives, including installing a hardened composite surface over the concrete slab.